发明名称 Method for producing civil engineering works under a railway line which is in use without the use of auxiliary metal bridge floor (deck)
摘要 The principle of this method lies in the use of bridge floors (decks) which are prefabricated at their definitive location instead of the conventional auxiliary metal bridge decks used to shore up the various infrastructure constructions of rail bridges. The definitive decks rest on a device of vertical supports of a first phase on which the definitive reinforced concrete header beams bear, the preliminary production of these constructions requiring only a simple and local reinforcement of the track. The design of the infrastructure constructions for the rail bridge incorporates the first phase vertical supports. This method according to the invention is particularly designed for any civil engineering bridge construction work under a track, of the rail bridge type. <IMAGE>
申请公布号 FR2650848(A1) 申请公布日期 1991.02.15
申请号 FR19890010946 申请日期 1989.08.10
申请人 TRAVAUX PUBLICS ENTR INDLE 发明人 ERIC RASTRELLY
分类号 E02D29/055;E21D9/00 主分类号 E02D29/055
代理机构 代理人
主权项
地址