发明名称 Method of starting combined gas-and-steam power plant when the mains fails
摘要 The method involves first bringing an emergency power supply into operation and using its electrical output to supply a fresh air supply, fuel supply (37), auxiliary ignition (36) for a boiler (24), an auxiliary system and pumps. Water in the boiler is boiled and superheated, the steam drives the steam turbine (28) and the steam turbine generator (30) is switched on when a defined steam turbine speed is reached and takes over supplying power to the start-up system (22,23). The starting system powers the gas turbine (20) until its speed exceeds its ignition speed. The gas turbine generator (22) is synchronised with the steam turbine generator and the steam turbine is finally operated with the normal load gradient.
申请公布号 DE19621926(A1) 申请公布日期 1997.12.04
申请号 DE19961021926 申请日期 1996.05.31
申请人 ABB PATENT GMBH, 68309 MANNHEIM, DE 发明人 SEELINGER, HERMANN, DIPL.-ING., 68623 LAMPERTHEIM, DE;BUEHRER, PETER, DIPL.-ING., LAUTERTAL, CH
分类号 F01K23/10;F02C7/26;(IPC1-7):F01K13/02;F01D19/00;F02C6/18 主分类号 F01K23/10
代理机构 代理人
主权项
地址