发明名称 CONSTRUCTION METHOD FOR INSTALLING GATE WITHOUT CUTTING OFF WATER SUPPLY
摘要 PROBLEM TO BE SOLVED: To provide a construction method for installing a gate without cutting off water supply, making it possible to install the gate in a gate chamber through simple operations while keeping water flow downstream. SOLUTION: The method includes (1) a process for sealing the inflow port 2 and the outflow port 3 of the gate chamber 1 and communicating the ports with each other by means of a flow passage pipe 5, (2) a process for draining water in the gate chamber 1 and installing a water cut-off plug 11 inside the flow passage pipe 5 to cut off water in the flow passage pipe 5, (3) a process for temporarily installing the gate 51 at the outflow port 3 or the inflow port 2 after the flow passage pipe 5 mounted at the outflow port 3 is partially and temporarily removed from the outflow port 3, and (4) a process for removing the water cut-off plug 11 from the flow passage pipe 5 after re-sealing a portion of the flow passage pipe 5 temporarily removed from the outflow port 3 and mounting it at the outflow port 3.
申请公布号 JP2001323444(A) 申请公布日期 2001.11.22
申请号 JP20000145808 申请日期 2000.05.18
申请人 MAEZAWA IND INC 发明人 SHIMIZU SEIJI
分类号 E02B7/26;F16L1/00;(IPC1-7):E02B7/26 主分类号 E02B7/26
代理机构 代理人
主权项
地址