摘要 |
PROBLEM TO BE SOLVED: To provide an image forming device capable of shortening a transit period of time (starting time) from the first state (standby state) to the second state (state for starting image formation), and saving the energy consumption, regardless of electric power capacity restriction of the power source line. SOLUTION: In this image forming device 8 that the power consumption thereof increases at the transit period from the first state to the second state, the device is provided with plural energy feeding means 1 and 3 for feeding the electric power in the transit time period. |