摘要 |
<P>PROBLEM TO BE SOLVED: To provide a control method for developing the performance of this system to the maximum by executing optimal control according to whether or not jobs are competing. <P>SOLUTION: A job manager automatically detects whether or not a plurality of jobs including PDL print are competing when the start of an operation is designated by an operating part, and uses a JBIG part 2040 equivalent to a main controller part when the jobs are not competing, and uses a JBIG part 2061 equivalent to a sub-controller part in the other case. <P>COPYRIGHT: (C)2004,JPO |