发明名称 Building energy usage reduction by automation of optimized plant operation times and sub-hourly building energy forecasting to determine plant faults
摘要 The invention provides a method for improved building energy usage reduction by computer automation of optimized plant operation times and sub-hourly building energy forecasting to determine plant faults. The invention provides a computer system to derive the NTL, mechanical heat-up (MHL) and mechanical cool-down (MCL) lags and in conjunction with a readily available interval weather forecast, the system can output various signals to indicate optimized start and stop times for heating and cooling equipment. The algorithm to calculate the 15-minute energy forecast is used to indicate out-of-control conditions in the operation of the plant.
申请公布号 US9395712(B2) 申请公布日期 2016.07.19
申请号 US201514607011 申请日期 2015.01.27
申请人 Shiel Patrick Andrew 发明人 Shiel Patrick Andrew
分类号 G05D3/12;G05B15/02;G05F1/66;G06Q10/04;G05B13/04;G06N99/00;F24D19/10;G06Q10/06;G06Q50/06;G06Q50/16;F24F11/00;G06F17/50 主分类号 G05D3/12
代理机构 代理人
主权项 1. An improved computer implemented method to forecast energy usage in 15-minute periods in a commercial building with an installed heating and cooling plant and a building management system, wherein, for said building of interest, the computer performs the following steps: a) determining a building's natural thermal lag (NTL) by linear regression based on a data set of daily energy usage and external temperature for a plurality of days; b) using said natural thermal lag to generate a best fit regression model to forecast said building's daily energy usage; c) determine which of said plurality of days exhibit external matching temperature profile to yield a set of matching days by:SS=∑i=1p⁢(TAFi-TCi)2 where SS represents a summation of squares over period i=1 to p, where p matches an optimal window size, wherein p is a preselected number of 15 minute periods TAFi is outside temperature at time period i, on said preselected day TCi is actual external temperature at time period i on day selected for comparison to said preselected day d) using an energy profile exhibited during said matching days, proportionately assigning said forecast of said building's daily energy usage for said preselected day into forecast of energy usage during a preselected number of 15-minute periods; e) calculating for said preselected day a start time for said building's installed heating and cooling system; and f) controlling chilling pumps using instructions received from said building management system at said start time.
地址 Dublin IE