发明名称
摘要 <p><P>PROBLEM TO BE SOLVED: To resolve a problem in supplying a component to two or more latter processes wherein it is not possible at the present to order one latter process in accordance with a component usage plane and another latter process at restocking. Ž<P>SOLUTION: An equalized component producing sequence capable of supplying the component to a latter process group and the latter processes to be supplied with the component are coordinated with a component production start frame divided by time intervals of component production start time, and the component producing sequence is planned by changing a production start component of the component production start frame assigned to a latter process ordered by a component restocking system. A production activity for the latter process ordered in accordance with the component usage plan and a production activity for the latter process ordered by the component restocking system are concurrently carried out in perspective while maintaining an equalization level of the whole at a high level, and necessity for each can be handled. Ž<P>COPYRIGHT: (C)2003,JPO Ž</p>
申请公布号 JP4200680(B2) 申请公布日期 2008.12.24
申请号 JP20020054448 申请日期 2002.02.28
申请人 发明人
分类号 G05B19/418;G06Q50/00;G06Q50/04 主分类号 G05B19/418
代理机构 代理人
主权项
地址