发明名称 Illumination monitoring process for making infill decisions
摘要 In a seismic survey, idealized subsurface illumination is generated using idealized survey data. Then, the following three steps are performed during each of a sequence of time intervals during the seismic survey. First, an incremental portion of actual survey data is collected, using data acquisition equipment at a data acquisition location. Second, the incremental portion of actual survey data is communicated from the data acquisition location to a data processing location. Third, an incremental portion of actual subsurface illumination is generated using the incremental portions of actual survey data, to incrementally generate actual subsurface illumination at the data processing location. It is determined if additional data acquisition is desirable by comparison of the idealized subsurface illumination and the actual subsurface illumination, in the data processing location. Then, any desirable additional data acquisition is performed in the data acquisition location before the data acquisition equipment leaves the data acquisition location.
申请公布号 US6925386(B2) 申请公布日期 2005.08.02
申请号 US20030662106 申请日期 2003.09.12
申请人 PGS AMERICAS, INC. 发明人 PRAMIK WILLIAM B.;MATHUR ALOKE K.;CAMPBELL STEVEN B.;LUBRANO ANDREW F.;STRANDENES SVERRE L.;LONG ANDREW SAMUEL;STRAND CHRISTIAN;DANIELSEN BARBARA JANINA;LIMA JOSTEIN
分类号 G01V;G01V1/28;(IPC1-7):G01V1/28 主分类号 G01V
代理机构 代理人
主权项
地址