摘要 |
<p><P>PROBLEM TO BE SOLVED: To provide a collectively bundling pipe that enables reduction in cut time and labor at a construction site, and to improve workability during transportation and construction. <P>SOLUTION: This collectively bundling pipe 4A comprises a sheathing tube 5 through which a cable is passed, a sheathing tube duct sleeve 6 through which the sheathing tube 5 is passed, a body tube 7A through which the sheathing tube duct sleeve 6 is passed, and a fixing plate 11A for fixing the sheathing tube duct sleeve 6 to the body tube 7A. One end of this bundling pipe 4A is connected to a body tube duct sleeve 3, provided to the sidewall 2 of a hand hole 1. At this side connected to the body tube duct sleeve 3, the sheathing tube duct sleeve 6 protrudes from the body tube 7A. On the body tube 7A, a cover 15 is provided that covers the outside circumferential portion of the protruding portion of the sheathing tube duct sleeve 6. <P>COPYRIGHT: (C)2007,JPO&INPIT</p> |