发明名称 |
CONCRETE-FILLED STEEL TOWER OF CABLE-STAYED BRIDGE |
摘要 |
A steel pylon cable-stayed bridge of a concrete filled structure having the optimum filling height is provided to prevent the occurrence of partial buckling on a steel pylon and to minimize the increase in construction expenses and dead weight caused by filling concrete in a hollow of steel to the appointed height. The invention relates to a steel pylon cable-stayed bridge of a concrete filled structure having the optimum filling height for increasing the safety of a steel pylon against horizontal load(Ph) and preventing the occurrence of partial buckling on a steel pylon by filling concrete in a hollow of a steel pylon(1) to be higher than the optimum filling height(Lce), so that the working moment(M) added on a steel pylon by horizontal load stays in a low-moment state as compared with a hollow cross-section local buckling moment(Msb) between the actual concrete filling height(Lc) and the optimum filling height or above/below the optimum filling height. |
申请公布号 |
KR100743343(B1) |
申请公布日期 |
2007.07.20 |
申请号 |
KR20060076359 |
申请日期 |
2006.08.11 |
申请人 |
SEOUL NATIONAL UNIVERSITY INDUSTRY FOUNDATION |
发明人 |
MOON, DO SOO;LEE, KYOUNG CHAN;CHANG, SUNG PIL |
分类号 |
E01D19/14;E01D11/00 |
主分类号 |
E01D19/14 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|