发明名称 Multi-RPO data protection
摘要 A system for disaster recovery including a controller (i) for controlling bandwidth usage of a disaster recovery system in accordance with a plurality of recovery point objectives (RPOs), each RPO designating a maximal time loss constraint for data recovery for an enterprise production system, and a corresponding bandwidth allocation for the disaster recovery system to use in replicating data for the enterprise production system, wherein the RPOs are applied in accordance with a calendar-based schedule of dates and times, and (ii) for issuing an RPO alert when the RPO maximal time loss constraint for a current date and time is not satisfied.
申请公布号 US9442748(B2) 申请公布日期 2016.09.13
申请号 US201213367448 申请日期 2012.02.07
申请人 ZERTO, LTD. 发明人 Burshan Chen;Shefi Omri;Kuszpet Yair
分类号 G06F11/14;G06F9/455;G06F11/20 主分类号 G06F11/14
代理机构 Foley & Lardner LLP 代理人 Foley & Lardner LLP ;De Vellis James
主权项 1. A system for disaster recovery, comprising: a controller for a server having at least one processor, the controller having a virtual manager configured to cause the at least one processor to manage at least one hypervisor and to cause the at least one processor to: (i) control bandwidth usage of a disaster recovery system in accordance with a plurality of recovery point objectives (RPOs), each of the plurality of RPOs designating a maximal time loss constraint for data recovery for an enterprise production system, wherein the enterprise production system includes a hypervisor system comprising multiple virtual protection groups, and a corresponding bandwidth allocation for the disaster recovery system to use in replicating data for the enterprise production system, wherein each of the plurality of RPOs are applied in accordance with a calendar-based schedule of dates and times, wherein multiple calendar-based schedules are used to schedule each of the RPOs and bandwidth allocations to control issuance of RPO alerts and the bandwidth usage for data replication for a corresponding virtual protection group of the enterprise production system, and(ii) issue an RPO alert when the maximal time loss constraint for a current date and time for one of the plurality of RPOs is not satisfied when the maximal time loss constraint exceeds a bandwidth constraint.
地址 Herzilya IL