发明名称 FAST MODEL PREDICTIVE PULSE PATTERN CONTROL
摘要 A method for controlling an electrical converter comprises the acts of determining an error value based on a difference between an estimated output value and a reference output value, the estimated output value being based on measurements in the electrical converter; comparing the error value with an error band and in the case of the error value exceeds the error band, controlling the electrical converter by switching to a different control scheme. The converter is controlled with the modified pre-calculated switching by determining a pre-calculated switching sequence for the converter based on an actual state of the electrical converter, the switching sequence comprising a sequence of switching transitions of the converter; modifying the pre-calculated switching sequence by modifying transition times of switching transitions of the pre-calculated switching sequence, such that the error value is minimized; and applying at least a part of the modified switching sequence to the electrical converter.
申请公布号 US2016276919(A1) 申请公布日期 2016.09.22
申请号 US201615169336 申请日期 2016.05.31
申请人 ABB Technology AG 发明人 Geyer Tobias;Oikonomou Nikolaos;Papafotiou Georgios
分类号 H02M1/08;H02M7/04;H02M7/44;H02M1/12 主分类号 H02M1/08
代理机构 代理人
主权项 1. A method for controlling an electrical converter, the method comprising: determining an error value based on a difference between an estimated output value and a reference output value the estimated output value being based on measurements in the electrical converter; comparing the error value with an error band and in the case of the error value being within the error band, controlling the electrical converter with a modified pre-calculated switching sequence by: determining a pre-calculated switching sequence for the converter based on an actual state of the electrical converter, the switching sequence comprising a sequence of switching transitions of the converter; modifying the pre-calculated switching sequence by modifying transition times of switching transitions of the pre-calculated switching sequence, such that the error value is minimized; applying at least a part of the modified switching sequence to the electrical converter; in the case where the error value exceeds the error band, controlling the electrical converter by switching to a different control scheme; whereby the different control scheme is based on inserting an additional switching transition into the pre-calculated switching sequence before the pre-calculated switching sequence is modified and the additional switching transition generate an additional pulse with an infinitesimal small width; selecting an error band associated with the error value from a plurality of error bands, whereby a voltage level of the inserted switching transition is dependent on the determined error band and a selection of an error band is based on past error values.
地址 Zurich CH