发明名称 СПОСОБ ПРОХОДКИ ВОССТАЮЩИХ С ОТБОЙКОЙ ПОРОДЫ СКВАЖИННЫМИ ЗАРЯДАМИ ВВ
摘要 FIELD: mining industry, applicable in driving of horizontal workings. ^ SUBSTANCE: compensation and blast holes are drilled in a rock mass over the entire length of the raise. The blast holes are charges partially or completely, and they are subjected to a short-delay blasting into compensation holes and then the formed compensation cavities. The interval of slowing-down between the holes blasted in succession, depending on the detonation characteristics of the explosive, charge diameter, physico-technical properties of the rock mass, height and diameter of the newly formed compensation cavities should provide for breaking of the rock from the mass and full outburst of the rock mass from the cavity, i.e. to prevent the pressing effect of the rock mass in the contour of the raise. ^ EFFECT: determined the interval of slowing-down between the holes blasted in succession with prevention of the rock mass pressing in the contour of the raise, which allows to increase the height of the blasted section and enhance the physico-technical properties of the raise driving. ^ 1 dwg, 1 ex, 2 tbl
申请公布号 RU2003134608(A) 申请公布日期 2005.07.20
申请号 RU20030134608 申请日期 2003.11.28
申请人 Открытое акционерное общество "Приаргунское производственное горно-химическое объединение" (RU) 发明人 Тюпин Владимир Николаевич (RU);Шкаровский Александр Иванович (RU)
分类号 F42D3/04;E21D9/00;F42D1/055 主分类号 F42D3/04
代理机构 代理人
主权项
地址