摘要 |
PROBLEM TO BE SOLVED: To reduce the power consumption of an information processing system.SOLUTION: An execution processing amount of each of a plurality of information processing devices is determined on the basis of an operation rate of a facility device such as an air conditioning system and a power supply device. If the operation rate is larger than a second operation rate set in advance, the number of executable information processing devices is increased more than when the operation rate is equal to or less than the second operation rate. When the operation rate increases in the case where the operation rate is equal to or larger than a first operation rate set in advance, the execution processing amount of each of the plurality of information processing devices is determined on the basis of the increase amount. In the case of being less than the first operation rate, at least one information processing device among the plurality of information processing devices is stopped according to a preset rule.SELECTED DRAWING: Figure 4 |