发明名称 Tunnel construction under river - involves staged side walls for caissons lowered onto revetting walls
摘要 <p>Opposite resetting walls (4), spaced at prescribed tunnel width, are constructed into the bottom of the bed (3), to initiate construction of tunnels (1) under waterways (2), esp. rivers. A caisson (5) is lowered onto both, at the tunnel periphery, and cleared of water by increased air pressure. A tunnel roof section (7) is made in this area (6) and anchored to the walls. The caisson is moved forward for the construction of the next section. The working area (8) is excavated below the tunnel roof, and a tunnel floor (10) and walls (11) are constructed, forming a tube, and connected to the roof.</p>
申请公布号 DE3022528(A1) 申请公布日期 1981.12.17
申请号 DE19803022528 申请日期 1980.06.16
申请人 HUTA-HEGERFELD AG 发明人 ZIMMERMANN,HEINZ,DIPL.-ING.
分类号 E02D29/077;(IPC1-7):21D10/16 主分类号 E02D29/077
代理机构 代理人
主权项
地址