摘要 |
PURPOSE:To obtain an absorption room heating/cooling system for rapidly room heating/cooling at the time of necessity without wastefully starting an absorption warm/cold water unit even when necessity of room heating/cooling cannot be previously found in an intermediate period. CONSTITUTION:A preparing operation of an absorption warm/cold water unit is controlled by setting conditions by combining an operation scheduled time zone stored in a memory unit 109 in a central controller 106, a reference temperature, and pieces of temperature information obtained by temperature sensors 103a, 103b, 103c. Accordingly, an effective preparation operation can be always conducted even when a starting time of room heating/cooling cooling is indefinite, and when any of switches of room side remote controllers 102a, 102b, 102c is closed, room heating/cooling cooling capacity can be rapidly performed. |