发明名称 CONSTRUCTION METHOD FOR SUBMARINE BURIED STRUCTURE
摘要 <p>PROBLEM TO BE SOLVED: To provide the construction method for a submarine buried structure in which a pipe can be protected excellently and construction work is facilitated when a seabottom ground surface is excavated and a pipe is laid. SOLUTION: An excavated ditch 20 is built by digging-down from a seabottom ground surface 8, crushed stones or the like are charged onto the bottom of the excavated ditch and a foundation bearing layer 21 is constructed, and a bearing member 27 is arranged onto the layer 21 and a pipe P is laid. Rubbles are charged to the underside and side faces of the pipe P and a rubble layer in fixed thickness is built, an asphalt mixture 25 is placed on the rubble layer and a bearing layer 22 is constructed, an upper covering layer 26 is executed onto the layer 22 and a top-face protective material 28 is installed, and bearing and protection to a pipeline can be conducted.</p>
申请公布号 JP2001032301(A) 申请公布日期 2001.02.06
申请号 JP19990204141 申请日期 1999.07.19
申请人 WORLD ENGINEERING KK;NIPPON ROAD CO LTD:THE;TAISEI ROTEC CORP;NIPPON KAIJO KOJI KK 发明人 WAGI TAKATSU;ORIGASA MASAMI;NONODA MITSURU;ITO TAKAHIKO;MATSUZAKI KATSUO;NAKANO HIROSHI
分类号 E02D29/073;F16L1/12;(IPC1-7):E02D29/073 主分类号 E02D29/073
代理机构 代理人
主权项
地址