摘要 |
<P>PROBLEM TO BE SOLVED: To prevent troubles such as variations in voltage and frequency from occurring in a power system even if the power system is linked with new energy. <P>SOLUTION: The output of the new energy generated by wind power generation, hydraulic power generation or the like is superposed to the power system 2 via a power conversion device 3, and power obtained by subtracting the new energy from the power system 2 is fed to a burnt-out ash melting device 7. <P>COPYRIGHT: (C)2004,JPO |