摘要 |
Long lateral wellbores are prepared for the production of hydrocarbons by preparing only a portion of the wellbore for production at a time, starting at a remote end of the long lateral wellbore. The prepared production section is produced until production becomes uneconomic before a further production section is prepared and produced. |