发明名称 Spar construction method
摘要 A method of constructing SPAR buoys comprising an elongate floating body (1) and a deck structure (2). The elongate body (1) is transported to the mooring site in its horizontal position. During erecting of the floating body (1) by ballasting it with water and alignment with the deck structure (2), the deck structure (2) remains attached to its buoyancy member (7). Hereby the use of large derricks can be avoided which provides a substantial cost reduction. After erecting the floating body, the body (1) may be ballasted to pass below the floating deck structure (2). Alternatively, the deck structure (2) may be deballasted or pulling cables (14) may be used to pull the coupling member (4) of the floating body (1) into contact with the coupling member (12) of the deck construction. Alternatively, the floating body (1) is at its upper ends connected to the deck structure (2) via a pivoting connection (22) such that during coupling the floating body may be hinged against the deck structure (2).
申请公布号 US6471444(B1) 申请公布日期 2002.10.29
申请号 US20000646865 申请日期 2000.09.25
申请人 OFFSHORE ENERGY DEVELOPMENT CORPORATION (OEDC) 发明人 POLLACK JACK
分类号 B63B9/06;(IPC1-7):E02B17/08 主分类号 B63B9/06
代理机构 代理人
主权项
地址