摘要 |
<p><P>PROBLEM TO BE SOLVED: To quickly evaluate a pipeline having influence on a pipe network, in the pipe network constituted of the network relationship between the optional number of water sources, pipeline and demand points of water. <P>SOLUTION: This pipe network is constituted of the network relationship between the optional number of water sources, the demand points of water and the pipwork. When evaluating the pipeline having influence on the pipe network, and when setting the pipeline being an evaluation object, a pipeline resistance factor in the pipeline being the evaluation object is set larger than an ordinary resistance factor of the pipeline, and the pipeline being the evaluation object is set and changed to a water hardly flowing pipeline. <P>COPYRIGHT: (C)2005,JPO&NCIPI</p> |