发明名称 |
FOUNDATION FOR CONSTRUCTION WORK |
摘要 |
PURPOSE:To prevent the interference of the operation of crane to other operations by providing an access path with a step difference held on a sheathing wall between the operating face of a mobile crane to perform hanging operations and the side wall of semi-underground building for atomic power station, etc. CONSTITUTION:An access path 6 lower than the ground's surface is provided adjacently to the outer wall 20 of a semi-underground building 1 in which the apparatus of atomic power facilities is to be housed. The access path 6 has a vertical wall 11 for sheathing on the side facing the outer wall 20. On the ground's surface 4, the ground 41 for a fixed distance to the vertical wall 11 is improved and an operation face 9 on which a mobile crane 10 is run or slewed is constructed. The interference of hanging operations by the crane 10 for building construction work to other operations can thus be prevented. |
申请公布号 |
JPS59228532(A) |
申请公布日期 |
1984.12.21 |
申请号 |
JP19830104039 |
申请日期 |
1983.06.10 |
申请人 |
HITACHI SEISAKUSHO KK;HITACHI UNYU KK |
发明人 |
SUZUKI TADAO;ISHII SUETSUGI;HASHIDA SHINJI |
分类号 |
E02D27/32;G21C13/00;(IPC1-7):E02D27/32 |
主分类号 |
E02D27/32 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|