摘要 |
PROBLEM TO BE SOLVED: To realize a design aid of a method for filling a clearance between a reinforcing member and an object lateral bridge part by a binding material, by penetrating a penetration bolt through both side parts and the object lateral bridge part of the reinforcing member, by applying the reinforcing member of joining a viaduct column to a bottom part, to a beam or a girder (the object lateral bridge part) of a reinforced concrete structure viaduct.SOLUTION: A design aid method comprises: an assuming sectional force setting step (a step S2) of setting assuming sectional force of operating on a joining part between the object lateral bridge part and the viaduct column; a temporary setting step (a step S10) of setting a temporary arrangement constitution of the penetration bolt; a bearing force calculation step (steps S22-S28) of calculating first bearing force of the joining part to the bending moment of the viaduct column with one end part in a lateral bridge direction of the reinforcing member as the rotational center and second bearing force to axial force and shearing force in the joining part based on a temporary arrangement constitution; and an evaluation step (a step S30) of evaluating the temporary arrangement constitution based on the assuming sectional force, the first and second bearing forces and a given safety factor. |