发明名称 高所作業車
摘要 PROBLEM TO BE SOLVED: To provide a boom lift enabled to prevent deterioration of a battery by reducing regeneration power.SOLUTION: When an operation to lower a lift mast is performed by a lift operation lever in the state of a battery voltage detector detecting that a battery 14 is charged to less than full charge, a vehicle controller 12 and a lift inverter 13a control regeneration of a lift motor 16 so as to lower the lift mast at a speed corresponding to the operation and store the power obtained by the regeneration in the battery 14, whereas when an operation to lower a lift mast is performed by the lift operation lever in the state of a battery voltage detector detecting that a battery 14 is charged to substantially full charge, the vehicle controller and the lift inverter control driving of the lift motor 16 so as to suppress a regeneration amount of the lift motor 16, or to cause consumption of power.
申请公布号 JP6071446(B2) 申请公布日期 2017.02.01
申请号 JP20120246978 申请日期 2012.11.09
申请人 株式会社アイチコーポレーション 发明人 中澤 俊一;小林 太;水口 裕朗;古荘 弘志;中盛 義正;森山 亮;柿沼 祐太;宮本 拓
分类号 B66F9/24 主分类号 B66F9/24
代理机构 代理人
主权项
地址