发明名称 併設トンネルの施工方法
摘要 PROBLEM TO BE SOLVED: To provide a tunnel displacement restraining structure and a method of constructing side tunnels capable of suppressing displacement of a side tunnel and ensuring relatively easy construction at a low cost.SOLUTION: A tunnel displacement restraining structure 1 is constructed by the method of constructing side tunnels which includes: a boring process for boring two tunnels 2,2; a drilling process for drilling a PC steel insertion hole in a transverse direction of the tunnels 2 relative to a pillar part 3 between the tunnels 2; a PC steel installation process for inserting PC steels 4,4 into the PC steel insertion holes; and a tension process for applying a tension force to the PC steels 4.
申请公布号 JP6058427(B2) 申请公布日期 2017.01.11
申请号 JP20130041397 申请日期 2013.03.04
申请人 大成建設株式会社 发明人 佐藤 将路;今中 晶紹
分类号 E21D9/14;E21D9/00 主分类号 E21D9/14
代理机构 代理人
主权项
地址