发明名称 トレーサビリティ管理システム及び方法
摘要 PROBLEM TO BE SOLVED: To provide a traceability management system and method capable of collecting history information on production or maintenance in real time without imposing an excessive load on a worker.SOLUTION: A traceability management system comprises: a database 2 which stores a plurality of work processes in association with materials used in each work process; a material identification information acquiring unit 303 acquiring material identification information on a work target material from a worker terminal; a work process information transmitting unit 304 reading out information indicating a work target process related to the work target material from the database 2 on the basis of the material identification information and transmitting the information to the worker terminal; a start signal acquiring unit 308 acquiring a start signal of the work target process from the worker terminal; an end signal acquiring unit 309 acquiring an end signal of the work target process from the worker terminal; a positional information acquiring unit 305 acquiring positional information on the work target material; and a history information outputting unit 310 outputting history information on the work target material on the basis of the start and end signals and the positional information.
申请公布号 JP6004831(B2) 申请公布日期 2016.10.12
申请号 JP20120181465 申请日期 2012.08.20
申请人 三菱重工業株式会社 发明人 福原 義也;大前 勝禎;道西 順哉;中井 聖典
分类号 G06Q50/04;G06Q10/06;G06Q10/08 主分类号 G06Q50/04
代理机构 代理人
主权项
地址