摘要 |
PROBLEM TO BE SOLVED: To provide a technology which reduces a load of charge cable routing during charging preparation time and clearing a charge cable after the completion of charging in a holding structure of the charge cable which is heavy-weight and holds the long charge cable.SOLUTION: A charge cable holding structure takes up a charge cable 3 and causes a charge cable support tool 2 to hold the charge cable 3. In the charge cable holding structure, a partition member 8 which partitions a charge cable take-up space above the charge cable support tool 2 is provided so as to move relative to the charge cable support tool 2 or be detachably attached to the charge cable support tool 2. |