摘要 |
PROBLEM TO BE SOLVED: To enable a cornice prevention instrument, which is installed in a building to prevent a cornice from being formed on a roof 31 of the building, to be fixed to the building without causing a leak in the roof.SOLUTION: A cornice prevention instrument 10 includes an upward extended support member 1 that has a lower part thereof fixed to a side surface 3a of a building 3, and a net-like snow cut-off member 2 that is attached to an upward extended part 12 of the support member 1 in parallel with the side surface 3a of the building 3.SELECTED DRAWING: Figure 1 |