发明名称 工程計画支援装置、プログラム、および工程計画支援方法
摘要 To allow an optimal work procedure using a processing machine to be automatically generated irrespective of whether or not an operator has experience relating thereto, provided is a process schedule support apparatus (20), which supports creation of control data on a processing machine, including: a removal area calculation unit (22) configured to calculate a removal area based on a difference between a product shape and a material shape; a divided area calculation unit (23) configured to generate a divided area by dividing the removal area based on a movable range of each processing machine being a candidate for performing work for removing the removal area; a tool path calculation unit (24) configured to generate tool paths, which are used to remove the divided area by respective processing machines, for each divided area; and a processing time calculation unit (25) configured to calculate a combination of the tool paths so that a time period for removing all the divided areas becomes minimum.
申请公布号 JP5977644(B2) 申请公布日期 2016.08.24
申请号 JP20120237190 申请日期 2012.10.26
申请人 インスティテュート フォア コンピュータ サイエンス アンド コントロール オブ ザ ハンガリアン アカデミー オブ サイエンシズ;株式会社日立製作所 发明人 中野 隆宏;野中 洋一;モノストリ ラースロー;エルドス ガボール;キス タマス;コバチェ アンドゥラス;ヴァンツァ ヨゼフ
分类号 G05B19/4097;G05B19/4093;G05B19/418 主分类号 G05B19/4097
代理机构 代理人
主权项
地址