发明名称 |
Method for laying overhead lines for high voltage overhead lines |
摘要 |
The method involves tensioning a cable between poles e.g. supporting poles, where the cable comprises a core wire designed as a high strength aluminum clad invar (HACIN) wire, and a cladding wire designed as a temperature resistant aluminum (TAL) wire or zirconium temperature resistant aluminum (ZTAL) wire. The cable is elongated after fixation of the cable at the poles at a pre-determined time period of about 30 to 60 minutes with a pre-determined force such that the wires are elastically elongated under displacement of transition points at low temperature. |
申请公布号 |
SI2367247(T1) |
申请公布日期 |
2016.05.31 |
申请号 |
SI20100031159 |
申请日期 |
2010.03.20 |
申请人 |
Lumpi-Berndorf Draht- und Seilwerk GmbH |
发明人 |
Fiers Peter;Pohlmann Heinrich |
分类号 |
|
主分类号 |
|
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|