发明名称 Power profile management
摘要 A power profile management method and system. The method includes retrieving by a computer processor input data associated with a user of power consumption devices at a specified location. The computer processor retrieves power consumption data comprising power consumption levels for the power consumption devices. The computer processor generates and transmits a mobile usage portfolio associated said user and the power consumption devices. The computer processor generates a load usage prediction report associated with the user and the power consumption devices. The load usage prediction report is generated based on the mobile usage portfolio and said power consumption data. The computer processor transmits the load usage prediction report to a power provider utility for analysis.
申请公布号 US9330425(B2) 申请公布日期 2016.05.03
申请号 US201313952089 申请日期 2013.07.26
申请人 International Business Machines Corporation 发明人 Boss Gregory J.;Hamilton, II Rick A.;Haugh Julianne F.;Sand Anne R.
分类号 G06Q50/06;G01D4/00;G06Q10/00;H04L12/00;H04L12/10;H02J3/00;H02J3/14 主分类号 G06Q50/06
代理机构 Schmeiser, Olsen & Watts 代理人 Schmeiser, Olsen & Watts ;Chung Matthew
主权项 1. A power usage prediction method comprising: retrieving, by a computer processor of a mobile computing system, first input data associated with a first user of a first plurality of power consumption devices at a first specified location; retrieving, by said computer processor, first power consumption data comprising a power consumption level for each power consumption device of said first plurality of power consumption devices; transmitting, by said computer processor to said first specified location, a first mobile usage portfolio associated said first user and said first plurality of power consumption devices; monitoring, by said computer processor, usage of plumbing fixtures at said first specified location; determining, by said computer processor based on results of said monitoring, a plumbing usage deviation value indicating that at least one plumbing fixture of said plumbing fixtures has not been used for a specified time period; generating, by said computer processor based on said first mobile usage portfolio, said plumbing usage deviation value, and said first power consumption data, a first load usage prediction report associated with said first user and said first plurality of power consumption devices; and transmitting, by said computer processor to a power provider utility for analysis, said first load usage prediction report.
地址 Armonk NY US