SIMULTANEOUS TUBULAR HANDLING SYSTEM A system and method for building and handling oilfield tubular stands while drilling operations are simultaneously and independently occurring with one drilling deck (16), one derrick (10) and one rotary system. An offline guided path horizontal to vertical arm (48) lifts and moves in the same plane tubulars (20) stored horizontally on the catwalk (22) and positions the tubulars (20) vertically directly into a preparation hole (46) for assembling and disassembling tubular stands while online drilling operations are simultaneously being conducted. A stand arm (58) lifts and lowers the tubulars into and out of the adjustable preparation hole (46), and transports the tubulars for storage to an auxiliary tubular racking station (60) in the upper part of the derrick. A bridge racker crane (86) moves tubular stands from the auxiliary tubular racking station (60) to the top drive (12) or another tubular racking station.
申请公布号
AU2014201872(B2)
申请公布日期
2016.04.28
申请号
AU20140201872
申请日期
2014.04.01
申请人
ATWOOD OCEANICS, INC.;FRIEDE GOLDMAN UNITED, LTD.
发明人
SMITH, BARRY M.;CHILDERS, MARK ALAN;RICH, HARVEY MARK;LARKIN, BRENDAN WILLIAM