发明名称 ソイルセメント連続壁の施工法
摘要 <P>PROBLEM TO BE SOLVED: To provide a method for constructing a soil cement continuous wall, which allows a core material to be erected immediately after one-way drilling with improved insertion ability of the core material and still ensures the erection accuracy of the core material and the drilling accuracy, with a reduced construction period. <P>SOLUTION: A soil cement wall of a preceding element 13a and a soil cement wall of a following element 13b are sequentially overlapped to form a continuous integrated wall body in a continuous one-way drilling construction. An H-shaped steel 10 is inserted in a drilled round hole of the preceding element 13a as a stress bearing material (core material). Two H-shaped steels 10 are connected to each other for installation in two neighboring drilled round holes adjacent to a leading end, among three drilled round holes linked together. <P>COPYRIGHT: (C)2013,JPO&INPIT
申请公布号 JP5893339(B2) 申请公布日期 2016.03.23
申请号 JP20110235810 申请日期 2011.10.27
申请人 株式会社丸徳基業 发明人 小野寺 秀隆
分类号 E02D5/20 主分类号 E02D5/20
代理机构 代理人
主权项
地址