发明名称 |
THE BRIDGE REINFORCE METHOD USING A MODULE TYPE FOUNDATION |
摘要 |
The present invention relates to a method for installing and breaking up a bridge support using a modular foundation, which facilitates installation and resolves a problem of producing a large quantity of concrete waste and polluting the environment. The method for installing and breaking up a bridge support using a modular foundation comprises: an excavation process of excavating and flattening a portion where a foundation is to be formed on the ground on which a structure for repairing a bridge is to be installed; a foundation module installation process of laying a plurality of foundation modules each made of concrete reinforced with rebars embedded therein and formed into a cuboid block in the excavated ground; a support installation process of installing a support on an upper surface where the foundation modules are installed; and a breaking up process of breaking up the support and the foundation modules when repair work is completed. The processes are sequentially performed. |
申请公布号 |
KR20160016554(A) |
申请公布日期 |
2016.02.15 |
申请号 |
KR20150052167 |
申请日期 |
2015.04.14 |
申请人 |
SHINCHANG LND. CO., LTD.;CHO, JOON BEOM |
发明人 |
CHO, JOON BEOM |
分类号 |
E01D21/00;E01D22/00;E02D27/01 |
主分类号 |
E01D21/00 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|