发明名称 MUTABLE CHRONOLOGIES FOR ACCOMMODATION OF RANDOMLY OCCURRING EVENT DELAYS
摘要 Causing a computing system to process events from a sequence of events that defines a correct order for said events independent from an order in which those events are received includes: defining a first variable, defining, for the first variable, a chronology of operations on the first variable associated with received events, receiving a first event that pertains to the first variable, executing a first operation on said first variable that results in a first update of the chronology, receiving a delayed event that pertains to the first variable, executing a second operation on said first variable that results in a second update of the chronology, and determining whether the first update is valid or invalid, wherein the delayed event precedes the first event in the sequence, the first update is based on the first event, and the second update is based on the delayed event.
申请公布号 US2016026502(A1) 申请公布日期 2016.01.28
申请号 US201514808243 申请日期 2015.07.24
申请人 Ab Initio Technology LLC 发明人 Stanfill Craig W.
分类号 G06F9/50;G06F9/54 主分类号 G06F9/50
代理机构 代理人
主权项 1. A method for causing a computing system to process events from a sequence of events that defines a correct order for said events independent from an order in which those events are received over an input device or port, said method including: defining a first variable, defining, for said first variable, a first chronology of operations on said first variable associated with received events, receiving a first event that pertains to said first variable, executing a first operation on said first variable, wherein said first operation results in a first update of said first chronology, after having received said first event, receiving a delayed event that pertains to said first variable, executing a second operation on said first variable, wherein said second operation results in a second update of said first chronology, and determining whether said first update is valid or invalid, wherein said delayed event precedes said first event in said sequence, wherein said first update is based on said first event, and wherein said second update is based on said delayed event.
地址 Lexington MA US