摘要 |
When the connector housings are positioned to a fitting operation start position and the fitting operation lever 30 on the second connector housing 20 is rotated, the second support recessed parts 22 send out fulcrum shafts 33 of the fitting operation lever 30 to the first support recessed parts 12. When the connector housings are completely fitted and connected to each other by a rotating operation of the fitting operation lever 30, the first support recessed parts 12 detach the fitting operation lever 30 form the connector housing. |