摘要 |
PROBLEM TO BE SOLVED: To provide a reinforcing bar arrangement jig capable of efficiently arranging a main reinforcement of a half PCa beam and other reinforced concrete members, for curtailing a construction period and reducing man-hours.SOLUTION: A reinforcing bar arrangement jig A is used for arranging a main reinforcement of a reinforced concrete member, and includes: a shaft bearing part 10 extending in a vertical direction A; a roller part 11 having an end connected to the shaft bearing part 10, the connection being rotatable around a rotation axis O1 extending in a horizontal direction T2; a lifting holding part 13 connected directly or indirectly to the shaft bearing part 10 and extended upward, the lifting holding part having a grip 12 to be held by an operator; and a locking part 14 installed integrally with the shaft bearing part 10 or the lifting holding part 13, above the roller part 11 leaving an interval, the locking part being hooked on a shear reinforcement for locking the reinforcing bar arrangement jig A. |