摘要 |
PURPOSE: A balcony vertical protective net is provided to minimize a safe accident caused by intervention of a different construction process. CONSTITUTION: A balcony vertical protective net is composed as follows. Buried anchors are installed in a balcony waterproof projection of a top floor and an upper water wall of a bottom floor. Bolts in which fastening holes are formed are fastened with the installed anchors. Wires(10) are coupled with the fastened bolts. A vertical protective net(20) in which multiple binding holes(21) are formed is fastened with the installed wires using a cable tie or a binding wire.
|