发明名称 |
CONTROL METHOD FOR FAST AND STABLE LOAD CONTROL BY COMPENSATING TURBINE AND BOILER RESPONSE DELAYS IN POWER PLANTS |
摘要 |
PURPOSE: A control method for a fast and stable load control by compensating turbine and boiler response delays in power plants are provided to prevent rapid life-shortening of a main and emergency equipment of power generation system by preventing the delay of generation output variation and maintaining a boiler and a turbine stable. CONSTITUTION: In a control method for a fast and stable load control by compensating turbine and boiler response delays in power plants, a unit master controls change the output of a power generation system (s10). A boiler master is controlled to supply a fuel, water, combustion air to a boiler auxiliary equipment based on the unit master signal(S12). The turbine master controls a steam valve of a turbine and control the output of power output(S14). An input is controlled by dynamical response compensation of the boiler master when output request value change.
|
申请公布号 |
KR20100048487(A) |
申请公布日期 |
2010.05.11 |
申请号 |
KR20080107672 |
申请日期 |
2008.10.31 |
申请人 |
KOREA ELECTRIC POWER CORPORATION |
发明人 |
LIM, GEON PYO;KIM, HO YOL;KIM, BYONG CHUL;PARK, DOO YONG;KIM, MUN SOO |
分类号 |
G05B19/048;F22B35/00;G05B19/00 |
主分类号 |
G05B19/048 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|