发明名称 RAMP RATE CONTROL FOR A GAS TURBINE
摘要 A method for operating a gas turbine is disclosed. The method can include receiving a command for a new load set-point for a gas turbine. In response to the received new load set-point, a fuel valve of the gas turbine can be metered to a first position, the first position corresponding to a first gas turbine load less than the new load set-point. After a first predetermined time, the fuel valve can be metered to a second position, the second position corresponding to a second gas turbine load greater than the first gas turbine load and less than the new load set-point. The fuel valve is incrementally metered more open until the gas turbine is operating at the new load set-point.
申请公布号 US2015337739(A1) 申请公布日期 2015.11.26
申请号 US201514717340 申请日期 2015.05.20
申请人 Wellhead Electric Company, Inc. 发明人 Heiberger Christian Skov;McDaniel John Grant
分类号 F02C9/26;F02C3/04 主分类号 F02C9/26
代理机构 代理人
主权项 1. A method for operating a gas turbine, comprising: receiving, at a controller, a command for a new load set-point for a gas turbine; in response to the received new load set-point, metering a fuel valve of the gas turbine to a first position, the first position corresponding to a first gas turbine load less than the new load set-point; after a first predetermined time, metering the fuel valve to a second position, the second position corresponding to the new load set-point; and operating the gas turbine at the new load set-point.
地址 Sacramento CA US