发明名称 CONSTRUCTION METHOD OF FLOOR TILE
摘要 PROBLEM TO BE SOLVED: To provide a construction method of a floor tile capable of finishing in a beautiful floor, by efficiently and accurately constructing the floor tile to an underfloor ground surface in a short time.SOLUTION: After temporarily fastening a reference floor tile 2a to a central part of an underfloor ground surface 1 along a construction reference line drawn on the underfloor ground surface 1 by a double-sided pressure sensitive adhesive tape 3, a floor tile 2 of the same size and the same shape as the reference floor tile 2a is stuck to and laid on the entire underfloor ground surface 1 around the reference floor tile 2a with an adhesive 4 applied to the underfloor ground surface 1 while joining mutual opposed end surfaces, then the reference floor tile 2a is removed from the underfloor ground surface together with the double-sided pressure sensitive adhesive tape 3, and the reference floor tile or the floor tile of the same size and the same shape as the reference floor tile is stuck to a trace after the removal with the adhesive.
申请公布号 JP2015203288(A) 申请公布日期 2015.11.16
申请号 JP20140084903 申请日期 2014.04.16
申请人 SEKISUI FULLER CO LTD 发明人 TAKAGI KATSUSHI;MURAYAMA YUKIHIKO
分类号 E04F15/00 主分类号 E04F15/00
代理机构 代理人
主权项
地址