摘要 |
The present invention relates to a form traveller using an up-lift supporting device and a vertical member, and a bridge construction method using the same to improve the effectiveness of anchor hole finishing operation with the installation of an up-lift supporting device for operating a form traveller during the construction of a bridge in FCM type, and to solve a problem of form traveller operation due to parallel construction of a girder. As a transverse connecting beam is installed in a gap between horizontal supporting beams of the up-lift supporting device, the transverse connecting beam and the horizontal supporting beam are fixed to only an inner anchor hole of a girder segment upper plate by an anchor bolt. |