发明名称 SHIELD EXCAVATION AND ASSEMBLY SIMULTANEOUS CONSTRUCTION METHOD
摘要 PROBLEM TO BE SOLVED: To provide a shield excavation and assembly simultaneous construction method which enables shortening of a construction period and reduction in cost spent for a propelling jack.SOLUTION: A length 2L of a segment assembly part between the front end of a tail seal and the furthest receding position of a shield jack is made to be twice a width L of a segment, and each stroke of the shield jack is made to have at least two or more lengths. The minimum stroke is set to "(the width of the segment)+(a K-segment insertion margin)+(an assembly allowance)" or more and the maximum stroke is set to "2×(the width of the segment)+(the assembly allowance)", and a second hydraulic circuit 50B is provided which divides the shield jack into one or plural groups, hydraulically controls, makes the position of a target point of application of force which is a resultant force point of respective propulsive forces arbitrarily controllable, and expands and contracts each shield jack during excavation. A segment assembly is started as soon as a space allowing the segment assembly to be performed is formed between the furthest receding position of a shield jack and an existing segment, and the segment assembly of one ring is completed during excavation.
申请公布号 JP2013163917(A) 申请公布日期 2013.08.22
申请号 JP20120027412 申请日期 2012.02.10
申请人 MITSUBISHI HEAVY INDUSTRIES MECHATRONICS SYSTEMS LTD;OHBAYASHI CORP 发明人 KUMAO YOSHIMITSU;MURAKAMI MASARU;MATOBA KAZUHIKO;KIMURA TSUTOMU;TAKAHASHI HIROSHI
分类号 E21D9/06 主分类号 E21D9/06
代理机构 代理人
主权项
地址