发明名称 |
PILE FOUNDATION CONSTRUCTION METHOD, PILE FOUNDATION CONSTRUCTION MANAGEMENT METHOD AND PILE FOUNDATION |
摘要 |
PROBLEM TO BE SOLVED: To provide a technique, related to a pile foundation construction method and a pile foundation, which enables a pile foundation to have excellent bearing capacity and to be removed in the future.SOLUTION: A pile foundation construction method uses a pile which is connected to a supporting column of a structure at an upper section thereof and has a thread on a periphery of a lower section thereof. The pile foundation construction method comprises: an excavation process to excavate a borehole to construct a pile foundation; a determination process to determine whether or not the borehole needs to be filled with sand depending on the ground of the borehole; a sand filling process to fill the borehole with a predetermined amount of the sand depending on the ground of the borehole when determining that the borehole needs to be filled with the sand; and a driving process to drive the pile in the borehole with sand filled therein. |
申请公布号 |
JP2015151802(A) |
申请公布日期 |
2015.08.24 |
申请号 |
JP20140027869 |
申请日期 |
2014.02.17 |
申请人 |
MAEDA CORP |
发明人 |
TANIGUCHI TAKESHI;MAGISHI TORU;HORIKAWA MANAKA;UEDA TATSUYA;TEZUKA HIROAKI;HAYASHI MIKIAKI;OKADA NAOHITO |
分类号 |
E02D27/32 |
主分类号 |
E02D27/32 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|