摘要 |
<p><P>PROBLEM TO BE SOLVED: To provide a waterproof construction method to meet requirement for the formation of a waterproof layer by double coating, which allows a notably thin part or a through-pinhole (hole passing through the full thickness) to be eliminated, achieves a uniform thickness of the waterproof layer, and easily manages the uniform application of a coating film waterproof material or the like. <P>SOLUTION: A coating film waterproof construction method applicable to the surface of a body to be waterproof processed comprises the steps of: fixing and laying a waterproof underlayer structure having a preformed coating film waterproof layer with a layer thickness of 0.8 to 5 mm on the surface of the body to be waterproof processed, and applying a coating film waterproof material on the coating film waterproof layer of the waterproof underlayer structure for the formation of a seamless coating film waterproof upper layer. <P>COPYRIGHT: (C)2013,JPO&INPIT</p> |