发明名称 |
Hydrogen generator, operating method of hydrogen generator, and fuel cell system |
摘要 |
A hydrogen generator associated with the invention comprises a hydro-desulfurizer (1) configured to remove sulfur compounds from a raw material; a reformer (2) configured to generate hydrogen-containing gas with use of the raw material that has passed through the hydro-desulfurizer (1); a raw material supply device (3) configured to supply the raw material to the reformer (2); a recycle flow passage (4) configured to supply a portion of the hydrogen-containing gas, discharged from the reformer (2), to the raw material before the raw material flows into the hydro-desulfurizer (1); an on-off valve (5) provided in the recycle flow passage (4); a pressure detector (6) located at a position upstream of the on-off valve (5) in the recycle flow passage (4); and an abnormality detector (7) configured to detect an abnormal clogging in the recycle flow passage (4) based on a pressure detected by the pressure detector (6), in a state in which the raw material supply device (3) is supplying the raw material to the reformer (2) with the on-off valve (5) closed. |
申请公布号 |
US9070915(B2) |
申请公布日期 |
2015.06.30 |
申请号 |
US201213989325 |
申请日期 |
2012.10.03 |
申请人 |
PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO., LTD. |
发明人 |
Tamura Yoshio;Kusumura Koichi |
分类号 |
H01M8/04;H01M8/02;H01M8/22;H01M8/06;C01B3/38 |
主分类号 |
H01M8/04 |
代理机构 |
McDermott Will & Emery LLP |
代理人 |
McDermott Will & Emery LLP |
主权项 |
1. A hydrogen generator comprising:
a hydro-desulfurizer configured to remove sulfur compounds from a raw material; a reformer configured to generate hydrogen-containing gas with use of the raw material that has passed through the hydro-desulfurizer; a raw material supply device configured to supply the raw material to the reformer; a recycle flow passage configured to supply a portion of the hydrogen-containing gas discharged from the reformer, to the raw material before the raw material flows into the hydro-desulfurizer; an on-off valve provided in said recycle flow passage; a pressure detector located at a position upstream of the on-off valve in the recycle flow passage; and an abnormality detector configured to detect an abnormal clogging in the recycle flow passage based on a pressure detected by the pressure detector, in a state in which the raw material supply device is supplying the raw material to the reformer, with the on-off valve closed. |
地址 |
Osaka JP |