发明名称 CENTRALIZED CONTROL SYSTEM
摘要 PROBLEM TO BE SOLVED: To provide a centralized control system having a switch for emergency stop capable of easily re-starting a programmed operation.SOLUTION: A plurality of air conditioners 4 are connected to a centralized control panel 1. At the centralized control panel 1, a programmed operation in which an operation starting and an operation stop of each of the air conditioners 4 are set in advance on the basis of month, day or time and operated, and a manual operation for controlling the operation starting and an operation stop of each of the air conditioners 4 at a site are properly selected. The centralized control panel 1 comprises a full-stop switch 16 for stopping the programmed operation and the manual operation of all the air conditioners 4 and cancelling the programmed operation, and a today's operation finish switch 17 for stopping the programmed operation and the manual operation for all the air conditioners 4, not cancelling the programmed operation and recovering the programmed operation upon changing of a day.
申请公布号 JP2015078826(A) 申请公布日期 2015.04.23
申请号 JP20130217931 申请日期 2013.10.19
申请人 CORONA CORP 发明人 NAKANO MINORU;SUGA TORU
分类号 F24F11/02 主分类号 F24F11/02
代理机构 代理人
主权项
地址