摘要 |
<p>PROBLEM TO BE SOLVED: To provide a game machine capable of effectively utilizing an operation that is executed from a notification of an operation method to a notification of an operation start instruction.SOLUTION: In the case where an operation of operation means according to a predetermined operation method is received, when executing an operation performance for reflecting the operation of the operation means on a performance, the operation start instruction is reported by providing a time difference after the operation method is reported. The operation of the operation means after the notification of the operation method is received (S1801: Yes) and the received operation of the operation means is reflected on the performance (S1416).</p> |