发明名称 CONSTRUCTION METHOD OF SUBSTRUCTURE OF EXPANSIVE GROUND AND SUBSTRUCTURE
摘要 <p>PROBLEM TO BE SOLVED: To provide a construction method of a substructure, which eliminates the need for the reinforcement of a base and the removal of a water absorption softening member from a predetermined space formed between a ground level of an expansive ground and a lower surface of the base, and thereby reduces construction cost of the substructure and shortens a construction period, and provide the substructure.SOLUTION: A construction method of a substructure 1 provided on the upper part of an expansive ground 5 is related. The construction method of the substructure 1 applying the present invention includes a first step of separating a base 2 to the upper part of the expansive ground 5 until the base 2 develops a predetermined strength and supporting an unwetted water absorption softening member 3, and a second step of reducing the strength of the water absorption softening member 3 by wetting the water absorption softening member 3 after the base 2 develops the predetermined strength.</p>
申请公布号 JP2015071903(A) 申请公布日期 2015.04.16
申请号 JP20130208083 申请日期 2013.10.03
申请人 NIPPON STEEL & SUMITOMO METAL 发明人 MIYAMA HIROTAKA;TAKANO YOSHIHIRO;HANADA KENSHI
分类号 E02D27/12;E02D27/28 主分类号 E02D27/12
代理机构 代理人
主权项
地址