摘要 |
<p>The present invention relates to a temporary bridge and a construction method thereof. The present invention can effectively resist a negative curve moment of a point occurring on a point unit and be rapidly built while ensuring sufficient bending reinforcement performance in the construction process. The temporary bridge includes: files which are installed on both point units to be spaced apart from each other in the vertical direction; and supports which are installed on both point units on the upper part of the files to rigidly install assembly molds to be fully curved upward in the vertical direction.</p> |